One verified data chain from sounding to decision.
Recognizes the Excel template, applies vessel calibration, detects anomalies, tracks history and creates safe before/after bunkering plans.
FLEET SOUNDING STATUS
Select vessel
Latest saved sounding values
VESSEL TANK PLAN
Fuel Tank Arrangement and Live Quantities
VLSFO LSMGO 85% line Above 85%
Each tank shows fill %, m³, MT and temperature. Product colour fills the tank up to 85%; only the quantity above 85% is red. No.1 is forward and higher-numbered tanks progress aft. This operational view does not replace the approved General Arrangement or tank plan.
Upload an XLS, XLSX or XLK file. The system automatically recognizes the vessel, template, tanks and calculation method. Preview does not save data.
PREVIEW
Waiting for a file
--
Tank data, workbook/server variances and quality alerts appear here after preview.
SERVER CALCULATION
New Sounding Report
Previous tank values → temperature correction / VCF → MT
REPORT OUTPUT
Sounding Report PDF
Save the report to enable PDF output.
Tank
Fuel
Sounding
Volume m³
Temp °C
Density @15°C kg/m³
Last confirmed supply
Corrected density kg/m³
VCF / Model
Calculated MT
Flag
LIVE BUNKERING CONTROL
Before / During / After Plan
85% safe target · 90% warning · 100% hard stop
REPORT OUTPUTS
Bunkering Plan PDF & Official Forms
Save the plan to enable PDF and Excel outputs.
BEFORE CONDITION
PLANNED TRANSFER→
AFTER CONDITION
CSM Official Form DataMSOF-09.1a and MSOF-09.1b fields. The approved templates are not redesigned.MSOF-09.1aMSOF-09.1b Rev 4
OPERATION TIMELINE
Capture each bunkering milestone
Pump Start begins the graph. Pump Stop closes it. Every time remains editable with an audit capture stamp.
Tank
Fuel
Capacity m³
Before sound / ullage
Before m³
Add m³
After sound / ullage
After m³
Margin to 85% m³
Tank status
Density @15°C
Temp °C
Live sounding
LIVE FUEL LOADING CURVE
Pump Start - Tank Soundings - Pump Stop
Every tank sounding is plotted at its automatically captured time. Pump Start is time zero; Pump Stop fixes the final graph boundary.
Planned Measured Sounding
Enter planned m3 or add an intermediate sounding to build the live loading curve.
DOCUMENT PACK
BDN, Survey, Lab & Photos
Attach approved bunker documents and photographs. Large photos are automatically resized for secure storage and a compact report package.
Files selected now are uploaded after the plan and sounding timeline are saved.
No documents selected.
OFFICIAL SAFETY CONTROL
MSOF-09.1b Bunkering Safety Checklist
Plan, tank, vessel, port and rate data fill automatically. Safety confirmations require an authorised user selection and are never inferred.
0%0 / 50 confirmed
Six rounds per side are transferred to the official PDF.
BUNKERING FIELD CALCULATOR
Quick Sounding
Select the vessel above, enter trim and the tanks measured. The existing vessel calibration and temperature correction calculate current MT and fill percentage without requiring a Bunkering Plan.
CALCULATION ONLY · NOT SAVED
Heel is assumed to be 0°. Density is entered at 15°C in kg/m³. Only tanks with complete readings are included in the measured-tank total; this is not the vessel's full ROB unless all fuel tanks are measured.
Enter trim and at least one complete tank reading.
MOBILE FIELD ENTRY
Rapid Bunker Operation
Enter the current sounding. Tank volume, received fuel, remaining delivery and fill percentage are calculated from the selected Bunkering Plan and its previous sounding report.
LIVE
Select a vessel with a saved Bunkering Plan.
Waiting for soundingValues above 85% trigger a red tank alarm.