Daily Running Cost
$0
Annual RC / 365, Transoba included
Annual Running Cost
$0
full year amortized cost base
Lube Oil / 1 Year
$0
$0/d Bunker / Lubrication
Transoba RC / Day
$0
$0 annual Transoba management
Unplanned RC / Day
$0
$0 annual unplanned
Cash Total
$0
booked / paid expense rows
Records
0
live filtered rows
Year-End Cost & Budget Curve
Status labels are ignored. Non-cancelled operating records are combined with monthly crew salary and management schedules; the current month is counted as paid.
loading
Current Position$0through current month
Future Crew Salary$0remaining monthly schedule
Future Management$0Transoba + CSM
Known Year-End Cost$0minimum known projection
Budget Remaining$0after known year-end cost
Other cost / commitments
Crew salary
Management fee
Annual budget curve
Future period
The year-end value includes known records and scheduled fixed costs. New future operating expenses are not invented.
Fleet Outlook
OD / OF / OX
Unplanned / Extra
$0
0 rows
| Scope | Realized RC | To Realize | Final RC | Realized % | Future % | Budget % | Status |
|---|
KPI Intelligence
live KPI
budget model
Fleet KPI Score
--
CHECKING
Budget Use
--
Annual RC / budget
Unplanned Share
planned guardrail
Open Exposure
--
ordered not closed
Data Quality
--
complete rows
Delivered Ratio
--
closed annual RC
Management Insight
Vessel KPI Status
| Vessel | Score | Budget | Unplanned | Open | Status |
|---|
Category Risk Watch
| Category | Annual RC | Unplanned | Open | Entries | Status |
|---|
Year-End Profit Outlook
TC hire model
live forecast
Fleet Revenue
$0
TC hire x working days
Year-End RC
$0
fixed + YTD + projection
Year-End Profit
$0
0.0% margin
Profit ex Transoba
$0
0.0% margin
Budget Use
0.0%
year-end RC / budget
| Vessel | Work Days | Revenue | Fixed Accrual | Variable YTD | Remaining Projection | Year-End RC | Profit | Margin | Budget Use | Status |
|---|
Detailed Analysis Report
management analysis
risk watch
Cost Mix & Technical Control
Normalized annual running-cost distribution for the current year and filters. Technical control focuses on Lube, Spare, Consumable and Service budgets.
Fleet / 2026
Click any row to open its filtered expense ledger.
Selected Annual RC$0100.0% basis
Cash Out 2026$0actual paid / booked
Unplanned$00.0% of annual RC
Technical Control$0Lube + Spare + Consumable + Service
Dry Dock / HAVUZ$00.0% of annual RC
Expense Group Mix
| Group | Entries | Annual RC | Cash Out 2026 | Share | Unplanned |
|---|
Equipment Mix
| Equipment Group | Entries | Annual RC | Cash Out 2026 | Share | Unplanned |
|---|
Technical Budget Checks
| Control | Entries | Annual RC | Cash Out 2026 | Share | Review |
|---|
Raw Category Detail
| Raw Category | Entries | Annual RC | Cash Out 2026 | Share | Unplanned |
|---|
Vessel Comparison
| Vessel | Total Annual RC | Cash Out 2026 | Fleet Share | Unplanned | Lube | Spare | Consumable | Dry Dock / HAVUZ |
|---|
Annual RC is the amortized or annualized cost. Cash Out 2026 is the actual amount paid or booked in the selected year. Percentages follow the active filters; `OTHER` preserves uncategorized records.
Profit Bridge by Vessel
| Vessel | Revenue | Fixed | YTD Variable | Remaining | Year-End RC | Profit | Margin | Budget Use |
|---|
Management Risk Watch
Top Cost Categories
| Category | Vessel | Annual RC | Cash Out 2026 | Fleet Share | Unplanned Cash | Open Cash |
|---|
Vendor Exposure
| Vendor | Vessel | Cash Out 2026 | Annual RC | Cash Share |
|---|
Selected Cash Out 2026$0
Selected Annual RC$0
Rows0
Supplier / Vendor Analysis
0 vendors| Vendor | Entries | Vessels | Cash Out 2026 | Annual RC | Share |
|---|
Equipment Cost Ratio
0 equipment| Equipment | Entries | Vessels | Cash Out 2026 | Annual RC | Share |
|---|
Monthly Trend
| Month | Entries | Cash Out 2026 | Annual RC | Unplanned Cash Out |
|---|
Open / Unplanned Action List
| Type | Vessel | Vendor | Equipment | Amount | Status |
|---|
Recommendations
SMC Finance Control / Fleet Consumables
Lubrication Oil Budget Report
Official lube spend, annual budget pace and uncoded oil exposure in one management view.
Live data
loading
Annual Budget$0Fleet approved allowance
Official Spend$00.0% utilized
Remaining Budget$0Available before pending coding
Pending Oil Coding$0Excluded until confirmed
Budget Pace
Calendar progress versus recognized and pending spend0.0%
0.0%
0.0%
Calculating budget pace...
0.0%Budget Used
Official spend$0
Available$0
Budget-to-date$0
Pace variance$0
Vessel Budget Control
Risk status loading| Vessel | Annual Budget | Official Spend | Remaining | Budget Use | Pace Variance | Pending | Status |
|---|---|---|---|---|---|---|---|
| Loading lubrication oil report... | |||||||
Pending Coding Review$0
--No pending oil-related cost rows.-$0
Official basis: Non-cancelled entries explicitly coded as LUBE or Lubeoil. Pending oil candidates remain outside official spend until confirmed.Generated from live Running Cost data
Budget vs Forecast
Excel model linesBudget Workspace
Edit yearly vessel budget lines here. Saving updates the live dashboard, KPI budget use and full report figures.
Editable budget$0
Committed$0
Remaining$0
Use0.0%
Unassigned legacy$0
| Budget Code | Line | Cost Unit | Annual Budget | Committed | Cash Out | Remaining | Used |
|---|
Vessel Forecast
| Vessel | Full Budget | Forecast RC | Variance | Use | Status |
|---|
Budget Lines
| Vessel | Line | Category | Budget |
|---|
2027-2029 Projection
future charter / drydock model| Year | TC Hire | Work Days | Revenue | Running Cost | Drydock | Total Cost | Profit | Margin |
|---|
Fleet Cost Dashboard
seed checking
By Vessel
Cost Distribution
Budget vs Running Cost
2026 model| Vessel | Full Budget | CSM Budget | Annual RC | RC / Budget | Status |
|---|
Purchase Document Intake
Upload emails, invoices and supporting documents. Extracted data remains editable until an authorised user approves it.
0 jobs
Drop documents hereMultiple EML, PDF, scan, Excel, CSV, ZIP and DOCX files are accepted. Combined PDFs can produce separate invoice records by page. Source files stay attached to the approved cost.
No document intake jobs yet.
Running Cost Entries
0 rows
Quick Date
Saved Views
Selected Rows
0
current table filter
Cash USD
$0
visible row total
Annual RC
$0
annualized running cost
Daily RC
$0/d
annual RC / 365
| Cost Date | Entry Date | Vessel | Supplier / Vendor | Equipment | Detail | Klass | Category | Budget Code | Status | Cash USD | Annual RC | Docs |
|---|